Why Choose Us for Solar Inspection & Testing Services?
- Monitoring of energy production on a consistent basis
- Documents / Diagram / Line Physical Inspection & Verification
- Protection Relays/ Breakers Commissioning Test Reports & Inspection.
- Continuity of protective Earthing and OR, Equipotential bonding conductors
- PV String open circuit voltage measurement
- Mechanical Design Information
- PV Array Insulation Resistance Test
- Module Hot Spot
- Bypass Diodes – Hot Spot
- Data interpretation and collection in real-time
- Switchyard related testing, transformer and switchgear related all tests at client sites.
- Critical as well as non-critical repairs
- Analysis of trends and KPIs to ensure continuous improvement
- Selection of specific key performance indicators to minimize cost while delivering the best possible system performance in the face of varying conditions
- Management of the inventory, spare parts, etc.
- Tracking of solar power generation logs and updating document service histories
- Optimization of balance between yield, cash flows, and costs of scheduled maintenance, etc
- Remote or on-site sensing of the various environmental conditions impacting the PV system being maintained
- Assessment of components and inverters to ascertain whether they have to be repaired or restored
- Identification of safety issues etc
Activities | Details |
Solar PV Plant Document Check | – SPV System / Plant Data · Basic System Information · System Design Information · System Installer Information · Warranty Documents – Wiring Diagram · Array General Information · PV String Information · Earthing and Over Voltage Protection · AC System – Technical Data Sheet |
Solar PV System/Plant Verification based upon Documentation | – System and Plant Inspection |
|
|
Solar PV System and Plant Testing | · Continuity of protective Earthing and OR, Equipotential bonding conductors · Polarity Test · PV String open circuit voltage measurement · Functional Tests · PV Array Insulation Resistance Test |
PV Array infrared Camera/ Drone Thermography Inspection | · Module Hot Spot · Bypass Diodes (Hot Spot) · Cable Connections Notes: Thermal Imager or an Infrared Camera will be used for carryout this activity. |
AC/Switch Yard & TL Inspection | · Documents / Diagram / Line Physical Inspection & Verification · Protection Relays/ Breakers Commissioning Test Reports & Inspection. · RMU, IDT Transformers, Power Transformers, LT & HT Panels Installation, Commissioning & Testing reports, Physical Verification. |